PAG GREGORIO D. PEREZ MARINA RENOVATION & SITE IMPROVEMENTS, PHASE I
Scope of work for this project consisted of the following: Removal and installation of new Galvanized pipe railings and ladder; Demolition...
Read MoreREPAIR SOUTH RUNWAY, AAFB, GUAM
This was a Design Build Contract. The work included the demolition and reconstruction of Runway 06R/24L at Andersen Air Force Base, Guam....
Read MoreREPAIR SHORELINE REVETMENT, BACK OF BOQ 8 & 9, U.S. NAVY SUPPORT FACILITY – DIEGO GARCIA, B.I.O.T.
This Design-Build project located in Diego Garcia (DG) included the repair of the existing revetment and restoration to 700 linear feet of...
Read MoreAMEC Repair Replacement of South Ramp 6 Hardstand and Runway 24L Overrun – AAFB, Guam
Black Construction Corporation (BCC) was contracted by AMEC to remove approximately 1000 lf of existing asphalt pavement at the South...
Read More