PAG GREGORIO D. PEREZ MARINA RENOVATION & SITE IMPROVEMENTS, PHASE I

marina-1000

Scope of work for this project consisted of the following:

  • Removal and installation of new Galvanized pipe railings and ladder;
  • Demolition of existing concrete bulkhead, cap and concrete walkway;
  • Installation of new sheet piles in front of deteriorating existing sheet piles;
  • Installation of new concrete bulkhead, concrete jacket and infill including the restoration of demolished concrete walkway;
  • Restoration of riprap stone disturbed during construction.

Significant Challenges & Solutions Provided

Plans did not allow for the widening of the channel leading into the boat basin resulting in limited access for port customers.  During construction, changes were proposed and accepted to widen the channel.  BCC worked closely with the port and their customers allowing the facility to remain safely in operation during the entire construction period including the processing of the US Army Corp permit that was required for the channel widening.

Notable Features:

–   New sheet piling and bulkhead that restored the Hagatna Boat Basin to “like new” condition.