DELL Pasay Office Fit-Out
The biggest call center fit-out project in the Philippines with an estimated construction floor area of 14,000 m2. Successfully completed in 3-1/2 months, a fast track job with notable scope of work as follows:
- 22 metric tons of structural steel for the server room. Strategic materials handling using the available small window openings utilizing mobile crane and fabricated shaft and trollies.
- 39,000 pieces of CHB for wall partitions
- 13,239 m2 of Acoustic Ceiling
- 14,552 m2 of Paint finish on walls and ceiling
- 8,800 m2 of Gypsum Walls
- 59 Fan Coil Units
- 16 Air Handling Units
- 6 units Precision A/C
- Pre-action System
- significant volume of ducting and piping works
- Vertical handling/cranage and installation of small sub-station and A/C equipment at Roof Deck (6th Floor):
- – 1000KW Genset
- – 2 units ELVSG & LVSG
- – Dry Type Transformer
- – Vacuum Circuit Breakers
- – 1500 KVA Transformer
- – 3 units 400 TR Chiller
- – 1200 TR Cooling Tower
- – Chilled Water Pump
- – Condenser Water Pump
- – Pads and Platforms
- – Security Fence
Guam Contractors’ Association 2006 Excellence in Construction Awards
International Category Winner
[hr]