Pages Navigation Menu

REPAIR DOUBLE BITT, ROMEO WHARF, APRA HARBOR

Posted in Infrastructure

PROJECT DESCRIPTION: This Design-Build project, located on Naval Base, Guam at Romeo Wharf in Apra Harbor, consisted of the replacement of...

Read More

2014 GCA/ABC Excellence in Construction Awards OVERALL Winner

Posted in News

2014 GCA/ABC Excellence in Construction Awards OVERALL Winner Black Construction Corporation has once again took home the top award as...

Read More

PAG GREGORIO D. PEREZ MARINA RENOVATION & SITE IMPROVEMENTS, PHASE I

Posted in Infrastructure - Heavy

Scope of work for this project consisted of the following: Removal and installation of new Galvanized pipe railings and ladder; Demolition...

Read More

REPAIR SOUTH RUNWAY, AAFB, GUAM

Posted in Infrastructure - Heavy

This was a Design Build Contract. The work included the demolition and reconstruction of Runway 06R/24L at Andersen Air Force Base, Guam....

Read More

REPAIR SHORELINE REVETMENT, BACK OF BOQ 8 & 9, U.S. NAVY SUPPORT FACILITY – DIEGO GARCIA, B.I.O.T.

Posted in Infrastructure - Heavy

This Design-Build project located in Diego Garcia (DG) included the repair of the existing revetment and restoration to 700 linear feet of...

Read More