Pages Navigation Menu

REPAIR SOUTH RUNWAY, AAFB, GUAM

Posted in Infrastructure - Heavy

This was a Design Build Contract. The work included the demolition and reconstruction of Runway 06R/24L at Andersen Air Force Base, Guam....

Read More

REPAIR SHORELINE REVETMENT, BACK OF BOQ 8 & 9, U.S. NAVY SUPPORT FACILITY – DIEGO GARCIA, B.I.O.T.

Posted in Infrastructure - Heavy

This Design-Build project located in Diego Garcia (DG) included the repair of the existing revetment and restoration to 700 linear feet of...

Read More

FY08 MCON P-431 Alpha and Bravo Wharf Improvements at the Commander Naval Region Marianas, Polaris Point – Guam

Posted in Infrastructure - Heavy

The design-build Alpha and Bravo Wharf Improvements project upgraded the existing wharves, constructed new utilities and support...

Read More

Kilo Wharf Improvements – Guam

Posted in Infrastructure - Heavy

The KILO Wharf Improvement Project provided improvements for the COMNAVMARIANAS Ordnance Department at Kilo Wharf and Orote Point,...

Read More

PAG Earthquake Damage Repair and Modification at Wharf Berth F3 – F6

Posted in Infrastructure - Heavy

Guam suffered severe damages to its infrastructure buildings including the only commercial port on the island during the 1993...

Read More

Repair Island Access Facilities, Phase I, Wake Island

Posted in Infrastructure - Heavy

This project involved the construction of a new wharf (dock facility) for the Navy (ROICC) located in Wake Island. The work included the...

Read More