Pages Navigation Menu

LAYON MUNICIPAL SANITARY LANDFILL ENTRANCE AREA FACILITIES AND CELLS 1 AND 2 – GUAM

Posted in Public Works - Environmental

Layon Municipal Sanitary Landfill Entrance Area Facilities is a waste disposal facility that accepts and processes the municipal solid...

Read More

PAG GREGORIO D. PEREZ MARINA RENOVATION & SITE IMPROVEMENTS, PHASE I

Posted in Infrastructure - Heavy

Scope of work for this project consisted of the following: Removal and installation of new Galvanized pipe railings and ladder; Demolition...

Read More

REPAIR SOUTH RUNWAY, AAFB, GUAM

Posted in Infrastructure - Heavy

This was a Design Build Contract. The work included the demolition and reconstruction of Runway 06R/24L at Andersen Air Force Base, Guam....

Read More

REPAIR SHORELINE REVETMENT, BACK OF BOQ 8 & 9, U.S. NAVY SUPPORT FACILITY – DIEGO GARCIA, B.I.O.T.

Posted in Infrastructure - Heavy

This Design-Build project located in Diego Garcia (DG) included the repair of the existing revetment and restoration to 700 linear feet of...

Read More

FY09 MCON P-181 WHARF UPGRADE AND WAREHOUSE, U.S. NAVY SUPPORT FACILITY – DIEGO GARCIA, B.I.O.T.

Posted in Industrial

This Design-Build project located in Diego Garcia (DG) included the upgrade to the potable water system, waste water treatment system,...

Read More