Camacho Landmark Center – Personal Finance

PROJECT DESCRIPTION:

pfcBlack Construction Corporation’s contracted scope for the PERSONAL FINANCE CENTER at CAMACHO LANDMARK PHASE 1 included the following:

  • Site Clearing including provision for environmental protection, demolition of existing structures, and disposal of garbage and unsuitable soil.
  • Earthworks including grading, backfilling using imported materials and compaction.
  • Cast in place construction of 18,000 SF three story commercial finance and office building
  • Installation of aluminum windows, doors and storefront
  • Elastomeric membrane roofing application and installation of imported clay tile roofing
  • Exterior Insulated Finishing System and EFS coatings
  • Architectural finishes including gypsum board wall systems and painting, ceramic tile, carpeting, restroom partitions and accessories, architectural casework and millwork
  • Miscellaneous metals including all aluminum railings, aluminum sunscreen trellis, bollards, and stair nosing
  • Installation of “next generation” three-stop traction elevator
  • Installation of fire alarm and sprinkler systems including reservoir and vertical turbine pump
  • Installation of HVAC, solar water heater, plumbing water and waste systems
  • Complete electrical system including 1005 back-up generator with automatic transfer switch
  • Site Development including 5,917 SY of asphalt paving and line markings, 480 LF perimeter fence and 400 LF retaining walls.
  • Underground utilities including storm water drainage, underground sewer, water lines including tapping to municipal supply.

Opportunities provided to the construction community: Black Construction for this project utilized local specialty contractors and service providers:

  • Perez Bros – Concrete supply
  • Smithbridge – supply of fill materials and aggregates
  • Guam Exterminators – Mesh termite barriers, soil treatment and long term bait traps
  • Glass Concepts – Glass and Glazing installation
  • Architectural Painting Services –Exterior Insulated Finish System and Interior Painting and caulking
  • Western Pacific Millwork – Cabinetry, Millwork and solid surface Countertops
  • Otis Elevator (Guam) – Traction elevator
  • Geo Engineering – soil and concrete testing
  • Hawaiian Rock Products – Asphalt paving
  • Highway Safety Systems – Line markings and graphics
  • Tradesmen, workers, field supervisors and technical staff support are all Guam based.

 

Contract No.:
None

 

Project Manager:
Bruce R. Johnson
Original Contract Amount:
$7,250,000.00
Final Contract Amount:
$7,250,000.00
Start Date:
August 07, 2012
Original Contract Completion:
February 2013
Final Contract Completion:
August 23, 2013
Liquidated damages assessed:
None
Offeror:
Prime Contractor
Percentage of work performed:
100%