DPW REHABILITATION OF ROUTE 4 BRIDGES OVER TALOFOFO AND TOGCHA RIVERS

Route4Bridges10

This project involved the rehabilitation of the Talofofo and Togcha bridges.  This included the demolition of the existing bridge decks, girders and abutments; modification of the existing foundations; and then fabricating and installing precast concrete girders up to 105 ft long, and constructing new abutments, bridge decks, approach slabs and guard rails  as well as the relocation of utilities.Route4Bridges09